It is Day Two of our Bathroom Remodel. It was supposed to be Day Three but the contractor didn’t make it on Monday, not a promising start. So far, everything in the downstairs bathroom has been ripped out except part of the floor. That should come out today. The washer and dryer are on the deck under a tarp along with the commode (which we are moving upstairs in the second phase of the Bathroom Remodel). We’ll be visiting the Laundromat for a couple of weeks, and we’ll have to trudge upstairs every time we have to relieve ourselves until the new toilet is installed.
I was amazed at what a hodgepodge that part of the house was under the drywall and tile. It looks as if the builder just made do with whatever materials he had lying around. Some of the wall is block and some is brick. There was no insulation! No wonder the bathroom was so cold.
The dogs are not too happy about all the hullabaloo and noise and being locked in the downstairs bedroom instead of having the run of the house. They don’t derive any benefit from the Bathroom Remodel. In fact, since we might actually spend more time in the bathrooms once they are done, they are going to be spending more time whining outside the bathroom doors and wondering what we are up to in there.
I hope the contractor knows what he is doing and that this turns out well. He has done good work on other things in the past and usually shows up. He is also cost conscious and strikes me as honest. But he is a contractor, and they are apt to disappear for days at a time while you have a big gaping hole in your house.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment